Backstory
The Guelph bottling plant for an American beverage company was experiencing seasonal humidity in their warehouse. Over time, this was a multi-million dollar problem, as any mold on product skids means that product is a loss.
MeadowBrook Construction was contracted to resolve the problematic humidity situation in the warehouse.
Upon completing the project, we have been asked to bid on their next project – building another humidity solution for their warehouse next door. As well, our Service Division is providing plumbing and electrical maintenance services.
Project Requirements
- Design a solution to increase airflow and substantially decrease humidity to below 50% RH in the existing 13,000 square-foot warehouse space.
- Ensure that the solution is one that can be maintained by the client’s internal team.
CLIENT NAME
LOCATION
SECTOR
MARKET
COMPLETION
CONTACT TYPE
PROJECT SIZE
Confidential
Mississauga
Manufacturing
Technology
Oct, 2022
Renovation
$1.1 Million
CLIENT NAME
Confidential
LOCATION
Guelph
SECTOR
Manufacturing
MARKET
Beverage
COMPLETION
Oct 2023
CONTRACT TYPE
Maintenance
PROJECT SIZE
$750,000
CLIENT NAME
Confidential
MARKET
Beverage
LOCATION
Guelph
COMPLETION
2023
CONTRACT TYPE
Maintenance
PROJECT SIZE
$750,000
THE CHALLENGE
Maintaining operations during construction
Warehouse operations continued during the build of the dehumidifying system. Therefore, it was critical that we consider the needs of warehouse operations and shipping/receiving. We did this in two ways:
1) Creating a staged approach to where and when we were working, taking into account
a) forklift drivers’ pre-specified routes, and
b) the dock door access sequences for external truck drivers, and,
2) Communicating well with the warehouse coordinator and shipping/receiving coordinator at all times, and especially as we moved from one stage of construction to the next.
This ensured that shipping, receiving, and warehousing activities were not adversely affected during construction...
Drawings that don’t match reality
In the middle of construction, we discovered a small variance between the client’s warehouse drawings and the actual layout of the aisles. In one area the drawing was off by a few feet, making it structurally unfeasible to place a dehumidifier where it was intended. Solving this problem on the spot, in a way that would work for the overall dehumidifying system and the forklift operators working in the aisles, was a collaboration of the design team, the construction team, the client’s corporate management, and the warehouse team.
THE CHALLENGE
Maintaining operations during construction
Warehouse operations continued during the build of the dehumidifying system. Therefore, it was critical that we consider the needs of warehouse operations and shipping/receiving. We did this in two ways:
a) Creating a staged approach to where and when we were working, taking into account
forklift drivers’ pre-specified routes, and
the dock door access sequences for external truck drivers, and,
b) Communicating well with the warehouse coordinator and shipping/receiving coordinator at all times, and especially as we moved from one stage of construction to the next.
This ensured that shipping, receiving and warehousing activities were not adversely affected during construction..
Drawings that don’t match reality
In the middle of construction, we discovered a small variance between the client’s warehouse drawings and the actual layout of the aisles. In one area the drawing was off by a few feet, making it structurally unfeasible to place a dehumidifier where it was intended. Solving this problem on the spot, in a way that would work for the overall dehumidifying system and the forklift operators working in the aisles, was a collaboration of the design team, the construction team, the client’s corporate management and the warehouse team.
THE SOLUTION
Working closely with system designers
End-to-end, from planning and designing to building and problem-solving, we worked closely with the Glendale Group. Not only did this help the project go more smoothly overall, but at every step we were able to develop better solutions.
To manage the humidity in the warehouse, we installed and mounted six dehumidifiers on structural steel 20 feet above the warehouse aisles.
A new plumbing system was created and installed to help address the excess humidity and route drain water to the proper channels.
We also created a new electrical system, running new infrastructure to an existing panel on the other side of the plant.
THE SOLUTION
Working closely with system designers
End-to-end, from planning and designing to building and problem-solving, we worked closely with the Glendale Group. Not only did this help the project go more smoothly overall, but at every step, we were able to develop better solutions.
To manage the humidity in the warehouse, we installed and mounted six dehumidifiers on structural steel 20 feet above the warehouse aisles.
A new plumbing system was created and installed to help address the excess humidity and route drain water to the proper channels.
We also created a new electrical system, running new infrastructure to an existing panel on the other side of the plant.
THE PROCESS
One team integrating infrastructure, plumbing & electrical
It is rewarding any time our efforts directly contribute to a client’s bottom line. In this case, mold is no longer causing product loss in the warehouse.
It’s doubly rewarding to hear from warehouse employees that their workspace is far more comfortable, due to increased air movement and decreased humidity.
Are you looking for a similar project?
We partner with our clients to overcome their facility challenges. From construction to building maintenance, we offer a multi-trade end-to-end solution capable of build your vision.
NEWSLETTER
Stay in touch
Get bi-weekly news and educational content in your inbox by subscribing to our newsletter!
LOOKING FOR AN OPPORTUNITY
Being part of a solid team, with strong values and a clear vision for the future, you’ll grow both personally and professionally.